Our facility is in PLANNING STAGES ONLY.  We have to acquire the property and then begin the construction phase.

​

PHASE 1: The Administration Building will be built, as well as Building B and the first two joining buildings.

PHASE 2: The two joining building on the opposite side and Building D.

PHASE 3:  Building C and the Men's Building E and one of the adjoining buildings.

PHASE 4:  Will add the Admin Building for the Men's area and Building A in the main campus.

​

*Subject to change.

​

smaller campus.jpg

The plan is for all rooms to be in the following order:  Studio connected to Two Bedroom connected to One Bedroom.  This is so if a family needs more than two bedrooms, a door can be opened for access to the next room. This type of section will be on each side of the building - with a wide hallway in the middle.